To enable me to position the dock further out in the canal when the lower winter tides are with us, I haven't driven the two spud poles (3.25" heavy galvanised pipe) into the canal bottom; they just rest there, steadied by some stays made from more light-duty galvanised pipe. So far, it's working quite well. Next is to cobble-up some sort of gangplank.